• warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.
  • warning: Parameter 2 to ed_classified_link_alter() expected to be a reference, value given in /home/soloneconomist/www/www/includes/common.inc on line 2968.

Ranshaw Way widening to begin, April 16

NORTH LIBERTY– Weather permitting, on Monday, April 16, work will begin to widen Ranshaw Way (Highway 965) to five lanes between Zeller and Cherry streets. The first stage of widening work will occur on the east side of the street. Two lanes of traffic will remain open through the project; however, the speed limit and lane width will be reduced to allow crews to begin utility work and install storm sewers.

. . . . . Full story available to subscribers only. . . . . .